Academia.edu no longer supports Internet Explorer.
To browse Academia.edu and the wider internet faster and more securely, please take a few seconds to upgrade your browser.
…
548 pages
1 file
In order to ensure the proper function in such environments, the shipping registers require that the apparatus has to be tested according to specific type approval tests, the most significant of which are vibration, dynamic inclination, humidity and dry-heat tests.



























































































![Rated operational voltage Ue [V]](https://figures.academia-assets.com/52858715/table_066.jpg)




































































































































































![Thus, the total power loss inside the enclosure is: P = 784 [W]
Here below the power losses for each connection:](https://figures.academia-assets.com/52858715/table_179.jpg)
















































![Table 1: Resistance values [Q/km] of single-core and multi-core
cables in copper and aluminium at 80 °C](https://figures.academia-assets.com/52858715/table_215.jpg)

![The formula (1) must be verified along the whole length of the cable. Due to the
shape of the specific let-through energy curve of a circuit breaker, it is generally
sufficient to verify formula (1) only for the maximum and minimum short-circuit
current that may affect the cable. The maximum value is normally the value
of the three-phase short-circuit current at the beginning of the line, while the
minimum value is the value of the phase to neutral short-circuit current (phase
to phase if the neutral conductor is not distributed) or phase to earth at the
end of the cable.
Table 2: Maximum withstood energy for cables k? S? [(kA)? s]](https://figures.academia-assets.com/52858715/table_216.jpg)



















































































































































![Short-circuit power S,__, [MVA]
knet
Net voltage U, [kV]
Generator](https://figures.academia-assets.com/52858715/table_313.jpg)














































1. Carry out the continuity test of protective conductors. 2. Measuring the insulation resistance of an electrical system (IR – Insulation Resistance Test). 3. Measuring the earth resistance of an earth electrode. 4. Carry out the Polarity and Phase Sequence Tests. 5. Measuring the voltage for an electrical system using KEW 6516. 6. Verification of conditions for protection by automatic disconnection of the supply. 7. Measuring the fault loop impedance (TN system) with analyzer. 8. Carry out the RCD test.

Loading Preview
Sorry, preview is currently unavailable. You can download the paper by clicking the button above.
Proceedings of the 2011 (2nd) International Conference on Engineering, Project, and Production Management, 2011