Academia.eduAcademia.edu

Tensile Surface Structures: A Practical Guide to Cable and Membrane Construction

Abstract

All rights reserved (including those of translation into other languages). No part of this book may be reproduced in any form -by photoprinting, or any other means -nor transmitted or translated into a machine language without written permission from the publisher. Registered names, trademarks, etc. used in this book, even when not specifi cally marked as such, are not to be considered unprotected by law.

References (122)

  1. Albrecht, R. (1973) | Montagelehre (Construction practice), Ernst & Sohn, Berlin Alpermann, H.; Gengnagel, C. (2003) | Interaktion von Mem- bran und biegesteifen Bogentragwerken (Interaction of mem- brane and stiff arch structures); in: Stahlbau 72, Heft 10, Ernst & Sohn, Berlin, p. 702 -707
  2. Baumann, Th. (2002) | Statisch-konstruktive Eigenschaften von PTFE-beschichtetem Glasgewebe (Structural and construction- al properties of PTFE-coated glass fabrics); in: Bauingenieur 77, Springer-Verlag, p. 158 -166
  3. Baumüller, D. (2000) | Rotationspneu (Rotating pneu roof ); in: Detail 6/2000, Institut für internationale Architektur-Dokumen- tation, München, p. 1086
  4. Beck, W. (1990) | Seilverguß (Rope speltering); in: Feyrer, K. u. a., Stehende Drahtseile und Seilendverbindungen, Expert-Verlag, Ehningen, p. 103 -119
  5. Bergermann, R.; Sobek, W. (1992) | Die Roofi ng der antiken Arena in Nîmes (The roofi ng of the ancient arena in Nîmes); in: Bauingenieur 67, Springer-Verlag, p. 213 -220
  6. Bergermann, R.; Göppert, K.; Schlaich, J. (1995) | Die Membran- überdachungen für das Gottlieb-Daimler-Stadion, Stuttgart, und den Gerry-Weber-Centre Court, Halle (Westfalen) (The mem- brane roofi ng of the Gottlieb Daimler Stadion, Stuttgart, and the Gerry Weber Centre Court, Halle, Westphalia); in: Bauinge nieur 70, Springer-Verlag, p. 251 -260
  7. Blum, R. (1982) | Spannungsmessungen in vorgespannten Membranen (Measurement of stress in pretensioned mem- branes); in: Otto, F.; Happold, E.; Bubner, E. (Hrsg.), Lufthallen- handbuch, Karl Krämer Verlag, Stuttgart, p. 268 -274
  8. Blum, R. (1990) | Zeltbaumaterialien (Materials for tent con- struction); in: Günther Brinkmann (Hrsg.), Leicht und Weit. Zur Konstruktion weitgespannter Flächentragwerke, Ergebnisse aus dem Sonderforschungsbereich 64, VCH-Verlagsgesellschaft, Weinheim, p. 200 -224
  9. Blum, R. (2002-1) | Material Properties of Coated Fabrics for Textile Architecture; in: Marijke Mollaert (Hrsg.), The Design of membrane and lightweight structures, VUB-Press, Brüssel, p. 63 -88
  10. Blum, R. (2002-2) | Bericht über die Denkmaleinhausungen in Clemenswerth und Weikersheim. Projekt "Winterzelt" ( Report of the housing for the ancient monuments in Cle- menswerth und Weikersheim. Project "Wintertime"); aus: http://www.echn.net/conservation/epuclications
  11. Gropper, H.; Sobek, W. (1985) | Zur konstrutiven Durchbildung ausschließlich zugbeanspruchter Membranränder (About the construction details of membrane edges loaded purely in ten sion) ; in: 3. Internationales Symposium des Sonderforschungsbereiches "Weitgespannte Flächentragwerke", Universität Stuttgart Habermann, K. J.; Schittich, C. (1994) | Temporäre Roofi ng der antiken Arena in Nîmes (Temporary roofi ng of the ancient amphi- theatre in Nîmes); in: Detail, Zeitschrift für Architektur + Baudetail, Institut für internationale Architektur-Dokumentation, München, p. 819 -824
  12. Heeg, M. (2007) | International Airport Bangkok -Enginee- ring, Konfektion und Montage des Membrandachs (Suvarnab- humi International Airport Bangkok -engineering, fabrication and erection of the membrane roof ); in: Zeitschrift Detail, Heft 7+8/2006 (Leichtbau + Systeme), Institut für internationale Architektur-Dokumentation, München, p. 824
  13. Hemminger, R. (1990) | Preßklemmenverbindungen (Pressed clamp connections); in: Feyrer, K. u. a., Stehende Drahtseile und Seilendverbindungen, Expert-Verlag, Ehningen, p. 132 -169
  14. Herrmann, H. (1986) | Aufbereitungsanlagen (Preparation plant); in: Hensen, F.; Knappe, W.; Potente, H. (Hrsg.), Kunststoff -Extru- sionstechnik II, Extrusionsanlagen, Carl Hanser Verlag, München, Vienna, p. 2 -33
  15. Holtermann, U. (2004) | Anforderungen beim Hochfrequenz- schweißen beim Fügen von Textilien (Demands on high- frequency welding of joints in textiles); Vortrag zum Kolloqui- um "Konfektion technischer Textilien" am Institut für Textil-und Verfahrenstechnik, Stuttgart
  16. Holst, S. (2006) | Suvarnabhumi International Airport Bangkok - Innovative Klimakonzeption (Suvarnabhumi International Airport Bangkok -innovative climatisation concept); in: Zeitschrift Detail, Heft 7 + 8/2006 (Leichtbau+Systeme), Institut für inter nationale Architektur-Dokumentation, München, p. 820
  17. Imgrüth, H. (2002) | Beschrieb und Nachweise für das Arbeitsge- rüst zur Montage der Kragenmembranen in Neuenburg (Descrip- tion and design of the working scaff old for the cantilever memb- rane in Neuchâtel);
  18. Histec Engineering AG company material Inauen, B. (2003) | Nicht veröff entlichtes, transkribiertes Ton- bandprotokoll eines Interviews an der TU Vienna (Unpublis- hed transcription of a taped interview at the Vienna Technical University)
  19. Jeromin, W. (2003) | Gerüste und Schalungen im konstruktiven Ingenieurbau: Konstruktion und Bemessung (Scaff olds and form- work in structural engineering: design and detailing), Springer- Verlag, Heidelberg u. a. Junker, D. (2004) | Nicht veröff entlichte Korrespondenz mit der Fa. VSL Schweiz AG (Unpublished correspondence with the company VSL Schweiz AG)
  20. Kleinhanß, K. (1981) | Zur Montage biegeweicher Bauelemente (On the erection of fl exible construction elements); in: Sonder- forschungsbereich 64, Weitgespannte Flächentragwerke, Seile und Bündel im Bauwesen, Mitteilungen 59/81, Beratungsstelle für Stahlverwendung, Düsseldorf, p. III. 4 -1-III. 4 -6
  21. Klopfer, H. (1981) | Der Langzeitschutz von Zuggliedern (The long-term protection of tension members); in: Sonder- forschungsbericht 64, Weitgespannte Flächentragwerke, Seile und Bündel im Bauwesen, Mitteilungen 59/81, Beratungsstelle für Stahl verwendung, Düsseldorf, p. II.4-1-II.4-11
  22. Labor Blum company material (1997) | Stuttgart, nicht veröff entli- cht (Unpublished material from the Laboratory Blum)
  23. Lenk, S. (2004) | Nicht veröff entlichtes, transkribiertes Ton- band protokoll eines Interviews an der TU Vienna (Unpub lished tran scription of a taped interview at the Vienna Technical University)
  24. Lenk, S. (2005) | Montage von Membranen (Erection of mem- branes); Vortrag an der TU-Vienna, Fakultät für Architektur und Raumplanung, Abteilung Hochbau 2, Jänner 2005
  25. Lenk, S. (2006) | Membranmontage (Membrane erection);
  26. Vor- trag an der TU-Vienna, Fakultät für Architektur und Raumplanung, Abteilung Hochbau 2, Dezember 2006
  27. Leonhardt, F.; Schlaich, J. (1973) | Vorgespannte Seilnetzkons- truktionen. Das Olympiadach in München (Pretensioned rope net construction. The Olympic roof in Munich); in: Weitgespannte Flächentragwerke, Mitteilungen 19/1973, Sonderforschungs- bericht 64, Universität Stuttgart Lindner, J.; Breitschaft, G.; Thaten, J. (2001) | Die Seilkraftmes- sungen bei der Errichtung des Forumdaches beim Sony-Center am Potsdamer Platz in Berlin (The measurement of forces in ropes during the erection of the Forum roof of the Sony Center at the Potsdamer Platz in Berlin), Festschrift Sander, Berlin Lindner, J.; Schulte, M.; Sischka, J.; Breitschaft, G.; Clarke, R.; Handel, E.; Zenkner, G. (1999) | Das Forumdach des Sony- Centers am Potsdamer Platz in Berlin (The Forum roof of the Sony Center at the Potsdamer Platz in Berlin); in: Stahlbau 68, Heft 12, Ernst & Sohn, Berlin, p. 975-994
  28. Lorenz, T.; Mandl, P.; Siokola, W.; Zechner, M (2004) | Membran- hülle am Flughafentower Vienna (Membrane envelope at the Vienna airport tower); in: Stahlbaurundschau, Oktober 2004, Österreichischer Stahlbauverband, Industriemagazin Verlag, Innsbruck, p. 48 -51
  29. Ludewig, S. (1974) | Montagebau -Grundlagen (Basics of construction erection), Wissensspeicher; VEB Verlag für Bau- wesen, Berlin (Ost)
  30. Miller, P. W. (2000) | Principles of Construction for Wide-Span Structures with Examples from the Millennium Dome; in: Widespan Roof Structures, Thomas Telford Publishing, London, Michael Barnes and Michael Dickson, p. 159 -168
  31. Minte, J. (1981) | Das mechanische Verhalten von Verbindungen beschichteter Chemiefasergewebe (The mechanical behaviour of joints in coated chemical fi bre fabrics); Dissertation an der Fakultät für Maschinenwesen, RWTH Aachen Mogk, R. (2000) | Bauen mit Seilen -Konstruktive Details aus der Praxis (Construction with ropes -design details from the practice); in: Leichte und ultraleichte Ingenieurbauten, 4. Dres- dner Baustatik-Seminar, Lehrstuhl für Statik, Technische Uni- versität Dresden, p. 141 -157
  32. Moncrieff , E.; Gründig, L.; Ströbel, D. (1999) | Zur Zuschnitts- berechnung von Pilgerzelten bei der Phase II des Mina-Valley- Projektes (On the patterning of pilgrim tents for phase II of the Mina Valley Project); in: Bauen mit Textilien, Heft 4/1999, Deut- scher Beton-und Bautechnik-Verein e. V., Berlin, p. 18 -21
  33. Mühlberger, H. (1984) | Darstellung und Klassifi zierung von mechanisch gespannten Membrankonstruktionen nach Be- rechnung und Konstruktion zur Verwendung in bauaufsicht- lichen Verfahren (Description and classifi cation of mechanically ten sioned membrane structures according to calculation and construction for use in building control procedures);
  34. Forschungs- bericht, Institut für Bautechnik -IfBt Berlin (Förderer), IRB-Verlag, Stuttgart
  35. Nentwing, J. (2000) | Kunststoff -Folien, Herstellung -Eigen- schaften -Anwendung (Plastic foils, manufacture, properties, application);
  36. Carl Hanser Verlag, München, Vienna Nolting-Firmenschrift (1999) | Temperatur nach Maß; Neu- zeitliche Heiztechnik (Temperature made to measure; modern heating technology), Gustav Nolting GmbH Oberbach, K. (2001) | Saechtling Kunststoff-Taschenbuch (Saechtling plastics pocket book), 28. Ausgabe, Carl Hanser Verlag, München, Vienna Oplatka, G. (1983) | Das Vorrecken von Seilen (The prestret- ching of ropes); in: Internationale Seilbahn-Rundschau, 5/1983, p. 241 -245 ÖNORM EN 12385-2 | Stahldrahtseile -Sicherheit -Teil 2: Begriff e, Bezeichnungen und Klassifi zierung (Steel wire ropes -safety - part 2: terms, descriptions and classifi cation), Aus gabe 2003 05 01, ON Österreichisches Normungsinstitut, Vienna, 2003
  37. ÖNORM M 9500 | Stahldrahtseile -Sicherheit -allgemeine Bestimmungen (Steel wire ropes -safety -general regulations), Ausgabe 1980 09 01, ON Österreichisches Normungsinstitut, Vienna, 1980
  38. Otto, F.; Happold, E.; Bubner, E. (1982) | IL 15, Lufthallenhand- buch (Air-supported hall handbook); Mitteilungen des Instituts für leichte Flächentragwerke, Karl Krämer Verlag, Stuttgart Palkowski, S. (1990) | Statik der Seilkonstruktionen (Structural design of rope construction), Springer Verlag, Vienna u. a. Peil, U. (2002) | Wire ropes -Seile -Herstellung und Eigen- schaften (Ropes -manufacture and properties); in: Institut für Stahlbau, TU Braunschweig (Hrsg.), Bauen mit Seilen, Praxis- Seminar 2002, p. 1.1 -1.21
  39. Petzschmann, E.; Bauer, H. (1991) | Handbuch der Stahl- baumontage, Grundlagen für die Aus-und Weiterbildung des Montageführungspersonals (Steel erection handbook. rules for the initial and further training of erection foremen), Stahlbau- Verlagsgesellschaft mbH, Köln PFEIFER company material (2003) | PFEIFER Holding GmbH & Co. KG, Memmingen, Germany Philipp Holzmann -Baudokumentation (1988) | King Fahd, Internationales Stadion Riyadh (Construction documentation of the King Fahd International stadium in Riyadh), Filmproduktion: Peter Cürlis, Berlin; Auftraggeber: Ministerium für Jugend und Sport in Deutschland Ramberger, G. (1978) | Die Berechnung der Normalkräfte in Zuggliedern über ihre Eigenfrequenz unter Berücksichtigung verschiedener Randbedingungen, der Biegesteifi gkeit und der Dämpfung (The calculation of axial loads in tension members through their resonance frequency, taking into account various constraints, the bending stiff ness and the attenuation) ; in: Stahl- bau, Heft 10/78, Ernst & Sohn, Berlin, p. 314 -318
  40. Ramberger, G. (2003) | Nicht veröff entlichtes, transkribiertes Tonbandprotokoll eines Interviews am Institut für Stahlbau, TU Vienna (Unpublished transcription of a taped interview at the Institute for Steel Construction, Vienna Technical University)
  41. Reitgruber, S. (2003) | Speichenradkonstruktionen (Spoked wheel construction), Diplomarbeit am Institut für Stahlbau, TU Vienna Rudorf-Witrin, W. (1999) | Stichwortsammlung der Broschü- re "50 Tipps -Der Weg zum Textilen Bauwerk", Herstellung und Montage (Keyword collection from the brochure "50 tips -the route to textile structure"), Frankfurt/M. Rudorf-Witrin, W. (2004) | Hochfrequenzschweißen von Memb- ranbauten (High-frequency welding of membrane buildings);
  42. Vortrag zum Kolloquium "Konfektion technischer Textilien" am Institut für Textil-und Verfahrenstechnik, Stuttgart Rudorf-Witrin, W.; Stimpfl e, B.; Blümel, S.; Pasternak, H. (2005) | Von der CargoLifter-Werfthalle zu Tropical Islands -Konstruk- tion, Herstellung und Montage der neuen ETFE-Folienkissen- Eindeckung (From the CargoLifter works hall to Tropical Islands -design detailing, production and erection of the new ETFE foil pillow external envelope) ; in: Bauingenieur, Band 81, Jänner 2006, Springer-VDI-Verlag, p. 33-42
  43. Ryser, R.; Badoux, J.-C. (2002) | Ein avantgardistisches Bauwerk für die Expo.02 am Arteplage von Neuenburg (An avant-garde structure for the Expo.02 at the Arteplage in Neuchâtel) ; in: Stahl- bau 71, Heft 8, Ernst & Sohn, Berlin p. 551 -557
  44. Saxe, K.; Kürten, R. (1992) | Zur Temperaturabhängigkeit des Kraft-Dehnungsverhalten PTFE-beschichteter Glasgewe- be bei üblichen Verarbeitungstemperaturen (On the tempera- ture-dependence of the force-strain behaviour of PTFE-coated fabrics at the usual processing temperatures); in: Bauingenieur 67, Springer-Verlag, p. 291 -296
  45. Scheffl er, M. (1994) | Grundlagen der Fördertechnik -Elemente und Triebwerke (Basics of materials handling technology -ele- ments and drives), Viehweg & Sohn Verlagsgesellschaft, Braun- schweig, Wiesbaden
  46. Schlaich, J.; Wagner, A. (1988) | Hybride Tragwerke 1+1=3. Das Ganze ist mehr als die Summe seiner Teile (Hybrid struc- tures 1+1=3. The whole is more than the sum of its parts); in: Zeitschrift Baukultur, 6/88, p. 27 -29
  47. Schlaich, J.; Bergermann, R.; Göppert, K. (1999) | Textile Roo- fi ngen für die Sportstätten der Commonwealth Games 1998 in Kuala Lumpur/Malaysia (Textile roofi ng of the sports halls for the 1998 Commonwealth Games in Kuala Lumpur, Malaysia); in: Bauen mit Textilien, Heft 2/1999, Deutscher Beton-und Bau- technik-Verein e.V., Berlin, p. 13 -19
  48. Schlaich, M. (2000) | Kuppel und Kissen, Stierkampfarena-Dach in Madrid (Dome and pillow, bull fi ght arena roof in Madrid); in: Deutsche Bauzeitung, 9/2000, p. 59 -69
  49. Schwarz, O.; Ebeling, F.-W.; Furth, B. (1999) | Kunststoffver- arbeitung (Plastics processing), Vogel Buchverlag, Würzburg Seethaler, M. (2007) | Nicht veröff entlichte Korrespondenz mit der Fa. Hightex GmbH (Unpublished correspondence with the company Hightex GmbH)
  50. Seliger, P. M. (1989) | Die Montage hoher Seilbahnstützen (The erection of high cableway pylons); Diplomarbeit am Institut für Eisenbahnwesen, TU Vienna Singenstroth, F. (1998) | Drahtseilkonstruktionen, Defi nitionen; in (Wire rope construction, defi nitions): Laufende DrahtWire ropes: Bemessung und Überwachung (Running wire ropes: specifi cation and monitoring), Feyrer, K. und 6 Mitautoren, Expert Verlag, Renningen-Malmsheim, p. 1 -28
  51. Siokola, W. (2004) | Nicht veröff entlichtes, transkribiertes Ton- bandprotokoll eines Interviews bei der Fa. Zeman-Stahl, Vienna (Unpublished transcription of a taped interview at the company Zeman-Stahl, Vienna)
  52. Sischka, J.; Stadler, F. (2003) | Das Forumdach des Sony-Centers in Berlin (The Forum roof of the Sony Center in Berlin); aus: http:// www.waagner-biro.at/CDA/main/DE/SG/Referenzen/Membran- konstruktionen/Sony_Center.htm
  53. Sobek, W. (1994) | Technologische Grundlagen des textilen Bau- ens (The technological basis of textile construction); in: Detail 6/1994, Institut für internationale Architektur -Dokumentation, München, p. 776 -779
  54. Sobek, W.; Speth, M. (1995) | Textile Werkstoff e (Textile mate- rials); in: Bauingenieur 70, Springer-Verlag, p. 243 -250
  55. Sobek, W.; Linder, J.; Krampen, J. (2004) | Der neue Flughafen in Bangkok -eine ingenieurtechnische Herausforderung (The new airport in Bangkok -an engineering challenge); in: Stahlbau 73, Heft 7, Ernst & Sohn, Berlin, p. 461 -467
  56. Stauske, D. (1990) | Herstellung und Montage von Seilbau- werken (Production and erection of rope structures); in: Feyrer, K. u. a., Stehende Drahtseile und Seilendverbindungen, Expert- Verlag, Ehningen, p. 71 -82
  57. Stauske, D. (1995) | Drahtseile mit neuartigem Korrosionsschutz (Wire ropes with innovative corrosion protection); in: Techtextil- Symposium 1995, Frankfurt/M., Vortrag No. 533
  58. Stauske, D. (2000) | Drahtseile für Seilbauwerke (Wire ropes for rope structures); in: Stahlbau, Heft 8/69, Ernst & Sohn, Berlin, p. 612 -618
  59. | Roofi ng, EKZ Grossfeldsiedlung, Vienna / Austria Location: . . . . . . . . . . . . . . . . . . . . . . Vienna Floridsdorf / Austria Completion: . . . . . . . . . . . . . . . . . . . construction phase 1: 2005; phase 2: 2007
  60. Area: . . . . . . . . . . . . . . . . . . . . . . . . . . approx. 3,500 m2 (construction phases 1 und 2) Membrane material type: . . . . . . Glass/PTFE fabric, glass mesh fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Ekazent Immobilien Management GmbH, Vienna / Austria General contractor: . . . . . . . . . . . . DELTA Projektconsult, Vienna / Austria Architect: . . . . . . . . . . . . . . . . . . . . . . DELTA Projektconsult, Vienna / Austria Structural engineer: . . . . . . . . . . . Teschner, Kosel / Germany Design of patterning: . . . . . . . . . . Teschner, Kosel / Germany Design of steelwork: . . . . . . . . . . . Teschner, Kosel / Germany Fire protection design: . . . . . . . . . Ingenieurbüro für Brandschutz und Sicherheit Düh, Vienna / Austria Steelwork and erection: . . . . . . . Profi lstahl, Judenburg / Austria Membrane fabrication: . . . . . . . . Cenotec, Greven / Germany Membrane erection: . . . . . . . . . . . Velabran, München / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Michael Seidel, Vienna / Austria
  61. | Roofi ng, Urban Loritz Platz, Vienna / Austria Location: . . . . . . . . . . . . . . . . . . . . . . Vienna / Austria Completion: . . . . . . . . . . . . . . . . . . . 1999
  62. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 2,000 m2 Membrane material type: . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Magistrat der Stadt Vienna / Austria Architect: . . . . . . . . . . . . . . . . . . . . . . Silja Tillner, Vienna / Austria Structural engineer: . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Steel erection: . . . . . . . . . . . . . . . . . Stuag Bau, Vienna / Austria Supply of wire ropes: . . . . . . . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . Skyspan Europe, Rimsting / Germany Membrane erection: . . . . . . . . . . . Skyspan Europe, Rimsting / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Herbert Schlosser/DIGI-TEL, Oggau / Austria
  63. | Square roofi ng, Zeltweg / Austria Location: . . . . . . . . . . . . . . . . . . . . . . Zeltweg, Styria / Austria Completion: . . . . . . . . . . . . . . . . . . . 2004
  64. Roofed area: . . . . . . . . . . . . . . . . . . . 408 m2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Verein Zeltweg Attraktiv Architect: . . . . . . . . . . . . . . . . . . . . . . Fabi & Krakau Architekten, Regensburg / Germany General contractor for membrane roof: . . . . . . . . . . . . . . . Covertex, Obing / Germany Structural engineer: . . . . . . . . . . . Teschner, Kosel / Germany Design of patterning: . . . . . . . . . . Teschner, Kosel / Germany Steel erection: . . . . . . . . . . . . . . . . . Sgardelli, Knittelfeld / Austria Membrane fabrication: . . . . . . . . KfM, Wallhausen / Germany Erection of membrane and wire ropes: . . . . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Michael Seidel, Vienna / Austria
  65. | Vehicle park roofi ng Waste Management Offi ce, Munich / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Munich / Germany Completion: . . . . . . . . . . . . . . . . . . . 1999
  66. Roofed area: . . . . . . . . . . . . . . . . . . . 8,400 m 2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . state capital Munich Architect: . . . . . . . . . . . . . . . . . . . . . . Ackermann & Partner, München / Germany Structural engineer: . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Design of patterning: . . . . . . . . . . Tensys, Bath / United Kingdom Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner Steel erection: . . . . . . . . . . . . . . . . . Seele, Gersthofen / Germany Wire ropes: . . . . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Fabricator: . . . . . . . . . . . . . . . . . . . . . Birdair Europe Stromeyer, Konstanz / Germany Membrane erection: . . . . . . . . . . . Birdair Europe Stromeyer, Konstanz / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Michael Seidel, Vienna / Austria 07 | Umbrellas IHK Würzburg / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Würzburg / Germany Completion: . . . . . . . . . . . . . . . . . . . 2003
  67. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 475 m2 Membrane material type: . . . . . . ETFE foil, rope-supported, printed Client: . . . . . . . . . . . . . . . . . . . . . . . . . IHK-Würzburg-Schweinfurt / Germany Architect: . . . . . . . . . . . . . . . . . . . . . . Franz Göger/Georg Redelbach, Marktheidenfeld / Germany General contractor membrane: . . . . . . . . . . . . . . . . . . . . Covertex, Obing / Germany Structural engineer: . . . . . . . . . . . SMP Schöne/Maatz + Partner (IPZ, Berlin)
  68. Membrane fabrication: . . . . . . . . KfM, Wallhausen / Germany Wire ropes: . . . . . . . . . . . . . . . . . . . . Görlitzer Draht-und Hanfseilfabrik, Görlitz / Germany Erection of membrane and wire ropes: . . . . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Covertex, Obing / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Vienna inner city Completion: . . . . . . . . . . . . . . . . . . . 2000
  69. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 270 m2 Membrane material type: . . . . . . three-layer ETFE pillow Client: . . . . . . . . . . . . . . . . . . . . . . . . . Schöllerbank Architect: . . . . . . . . . . . . . . . . . . . . . . Jabornegg Pálff y, Vienna / Austria Structural engineer: . . . . . . . . . . . Karlheinz Wagner, Vienna / Austria Steelwork and wire ropes: . . . . . Ma-Tec, Neutal / Austria Fabricator of pillow: . . . . . . . . . . . Skyspan, Rimsting / Germany Erection of pillow: . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Werner Kaligofsky, Vienna / Austria
  70. | Roofi ng of courtyard, Vienna city hall / Austria Location: . . . . . . . . . . . . . . . . . . . . . . Vienna inner city / Austria Completion: . . . . . . . . . . . . . . . . . . . 2000
  71. Roofed area: . . . . . . . . . . . . . . . . . . . 1,050 m2 Membrane material type: . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Magistrat der Stadt Vienna Architect: . . . . . . . . . . . . . . . . . . . . . . Silja Tillner, Vienna / Austria Structural engineer: . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Design of patterning: . . . . . . . . . . Tensys, Bath / United Kingdom Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Project management: . . . . . . . . . Vasko & Partner, Vienna / Austria Steel erection: . . . . . . . . . . . . . . . . . Filzamer, Vienna / Austria Wire ropes: . . . . . . . . . . . . . . . . . . . . Augsburger Drahtseilfabrik, Friedberg / Derching / Germany Membrane fabrication: . . . . . . . . Spandome Center Kft, Budapest / Hungary Membrane erection: . . . . . . . . . . . Covertex, Obing / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Michael Seidel, Vienna / Austria 10 | World cup football globe Location: . . . . . . . . . . . . . . . . . . . . . . Cologne / Germany Completion: . . . . . . . . . . . . . . . . . . . 2003
  72. Roof area: . . . . . . . . . . . . . . . . . . . . . 736 m2 Membrane material type: . . . . . . printed three-layer ETFE-PVC pneumatic pillow Client: . . . . . . . . . . . . . . . . . . . . . . . . . DFB Architect: . . . . . . . . . . . . . . . . . . . . . . Art Event, Vienna / Austria General contractor membrane: . . . . . . . . . . . . . . . . . . . . Covertex, Obing / Germany Structural engineer: . . . . . . . . . . . Mero, Würzburg / Germany Design of patterning: . . . . . . . . . . Covertex, Obing / Germany Material specialist report, approval of individual cases: . . . Labor Blum, Stuttgart / Germany Steel erection: . . . . . . . . . . . . . . . . . Mero, Würzburg / Germany Fabricator of pillows: . . . . . . . . . . KfM, Wallhausen / Germany Erection of pillow: . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Frank Rümmele, Alfter / Germany
  73. | Pillow roofi ng, Galets Expo 2002 Location: . . . . . . . . . . . . . . . . . . . . . . Neuchâtel / Switzerland Completion: . . . . . . . . . . . . . . . . . . . 2002
  74. Roofed area (Galets 1, 2, 3): . . . . approx. 14,900 m 2 Membrane material type: . . . . . . PES/PVC fabric pillow Client: . . . . . . . . . . . . . . . . . . . . . . . . . Expo 02
  75. Architect: . . . . . . . . . . . . . . . . . . . . . . Multipack, Neuchâtel / Switzerland Structural design of pillows: . . . . IF-Group, Reichenau / Germany Detailed design patterning of pillows: . . . . . . . . . . . . . . . . . . . . . IF-Group, Reichenau / Germany Detailed design of steelwork: . . Zwahlen & Mayr, Aigle / Switzerland Erection planning pillow: . . . . . . IF-Group, Reichenau / Germany Material supervision and monitoring -air pressure, tension and temperature: . . . . . . Labor Blum, Stuttgart / Germany Steel erection: . . . . . . . . . . . . . . . . . Zwahlen & Mayr, Aigle / Switzerland Membrane fabrication: . . . . . . . . CANOBBIO, Castelnuovo Scrivia / Italy Erection of pillow: . . . . . . . . . . . . . Inauen-Schätti, Schwanden / Switzerland Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © CANOBBIO, Castelnuovo Scrivia / Italy
  76. | Christo and Jeanne-Claude: Wrapped Reichstag, Berlin 1971-95. © Christo 1995
  77. Location: . . . . . . . . . . . . . . . . . . . . . . Platz der Republik, Berlin / Germany Completion: . . . . . . . . . . . . . . . . . . . 1995
  78. Wrapped surface: . . . . . . . . . . . . . . approx. 50,000 m2 Membrane material type: . . . . . . . . PP fabric, aluminium steamed (approx. 100,000 m2)
  79. Client: . . . . . . . . . . . . . . . . . . . . . . . . . Verhüllte Reichstag GmbH, directors: Roland Specker und Wolfgang Volz Concept and design: . . . . . . . . . . Christo und Jeanne-Claude Javacheff Structural design and patterning: . . . . . . . . . . . . . . . . . . . . IPL, Radolfzell / Germany Steel erection: . . . . . . . . . . . . . . . . . Steel erection Zwickau, Zwickau / Germany Fabrication of wire ropes: . . . . . . Gleistein Tauwerk, Bremen / Germany Membrane fabrication: . . . . . . . . Spreewald Planen, Vetschau / Germany; Zeltaplan, Taucha / Germany; Canobbio, Serravalle Scrivia / Italy Fabricator of air pillows: . . . . . . . Heba, Emsdetten / Germany Membrane erection: . . . . . . . . . . . Reichstagverhüllungsmontage GmbH Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Wolfgang Volz, Düsseldorf / Germany 17 | Roofi ng of access building, Suvarnabhumi International Airport Bangkok / Thailand Location: . . . . . . . . . . . . . . . . . . . . . . Samut Prakarn Province, Bangkok / Thailand Completion: . . . . . . . . . . . . . . . . . . . 2005
  80. Area: . . . . . . . . . . . . . . . . . . . . . . . . . . approx. 108,000 m2 Membrane material type (three-layer): . . . . . . . . . . . . . . . . . . . Outer: Glass/PTFE fabric; Middle: Poly car- bonate boards on rope net; Inner: glass fi bre fabric, PTFE-Ter-Polymer-coated and aluminium steamed (Low-E coated)
  81. Client: . . . . . . . . . . . . . . . . . . . . . . . . . Royal Thai Government / Thailand General contractor: . . . . . . . . . . . . ITO Joint Venture Architect: . . . . . . . . . . . . . . . . . . . . . . Murphy/Jahn, Chicago / USA; ACT Consultants, Bangkok / Thailand; TAMS Consultants/Earth Tech, New York / USA Structural engineer: . . . . . . . . . . . Werner Sobek Ingenieure, Stuttgart / Germany General contractor for membrane roof: . . . . . . . . . . . . . . . Hightex, Rimsting / Germany Design of patterning: . . . . . . . . . . Tensys, Bath / United Kingdom Acoustics/material development and Material supervision: . . . . . . Labor Blum, Stuttgart / Germany Air conditioning: . . . . . . . . . . . . . . Transsolar Energietechnik, Stuttgart / Germany
  82. Coating Low-E membrane: . . . . Polymade ITT, Bergheim / Germany Glass fi bre fabric: . . . . . . . . . . . . . . Interglas, Erbach / Germany Membrane fabrication: . . . . . . . . Hightex Membrane erection: . . . . . . . . . . . Hightex Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Rainer Viertlböck, Architecture Photographie
  83. | Roofi ng of Airport Center MAC, Munich / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Munich airport / Germany Completion: . . . . . . . . . . . . . . . . . . . 1999
  84. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 7,500 m2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Flughafen München / Germany Architect: . . . . . . . . . . . . . . . . . . . . . . Murphy/Jahn, Chicago / USA Structural engineer: . . . . . . . . . . . Ove Arup Steel erection: . . . . . . . . . . . . . . . . . Steel erection Wolf, Rosenheim / Germany Supply of wire ropes: . . . . . . . . . . Redaelli, Cologno Monzese / Italy Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Engelhardt / Sellin, Aschau / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Vienna Schwechat / Austria Completion: . . . . . . . . . . . . . . . . . . . 2005
  85. Area: . . . . . . . . . . . . . . . . . . . . . . . . . . 3,324 m2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Flughafen Vienna / Austria Architect: . . . . . . . . . . . . . . . . . . . . . . Zechner & Zechner, Vienna / Austria General contractor membrane: . . . . . . . . . . . . . . . . . . . . Covertex, Obing / Germany Structural engineer: . . . . . . . . . . . Lorenz Consult, Graz / Austria Membrane design and form fi nding: . . . . . . . . . . . . . . . . . . Peter Mandl, Graz / Austria Design of patterning: . . . . . . . . . . form TL, Radolfzell / Germany Materials specialist report: . . . . . Labor Blum, Stuttgart / Germany Erection planning steel erection: . . . . . . . . . . . . . . . . . Zeman, Vienna / Austria Steel erection und Montage: . . Zeman, Vienna / Austria Membrane fabrication: . . . . . . . . KfM, Wallhausen / Germany Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Herbert Schlosser/DIGI-TEL, Oggau / Germany your partner for special installation -www.montage-service.com
  86. Montageservice SL GmbH Ismaninger Straße 98 85399 Hallbergmoos Germany info@montage-service.com 20 | Roofi ng of Dresden Main Station / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Main railway station, Dresden / Germany Completion: . . . . . . . . . . . . . . . . . . . 2006
  87. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 30,000 m2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Deutsche Bahn AG Architect: . . . . . . . . . . . . . . . . . . . . . . Foster & Partners, London / England Structural engineer: . . . . . . . . . . . Happold, Berlin and London / Germany and England Membrane fabrication: . . . . . . . . Skyspan Europe, Rimsting / Germany Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Michael Seidel, Vienna / Austria
  88. | Roofi ng of Fröttmaning station, Munich / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Fröttmaning, Munich / Germany Completion: . . . . . . . . . . . . . . . . . . . 2005
  89. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 7,200 m2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Landeshauptstadt Munich, Baureferat Architect: . . . . . . . . . . . . . . . . . . . . . . Bohn Architekten, Munich / Germany General contractor for membrane roof: . . . . . . . . . . . . . . . Covertex, Obing / Germany Structural engineer: . . . . . . . . . . . Christoph Ackermann, Munich / Germany Design of patterning: . . . . . . . . . . Teschner, Kosel / Germany Compensation tests and approval of individual cases: . . . . Labor Blum, Stuttgart / Germany Steel erection: . . . . . . . . . . . . . . . . . Maurer Söhne, Munich / Germany Wire ropes: . . . . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . KfM, Wallhausen / Germany Membrane erection and Wire ropes: . . . . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Florian Scheiber, Munich / Germany
  90. | Roofi ng of stands, Formula 1 Ring, Istanbul / Turkey Location: . . . . . . . . . . . . . . . . . . . . . . Istanbul / Turkey Completion: . . . . . . . . . . . . . . . . . . . 2005
  91. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 18,000 m2 Membrane material type: . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . FIYAS Formular Istanbul Yatirim A.S., Istanbul / Turkey
  92. Architect: . . . . . . . . . . . . . . . . . . . . . . ORION Insaat & Dekorasyon, Istan bul / Turkey; Teschner, Kosel / Germany General contractor for membrane roof: . . . . . . . . . . . . . . . CENO TEC, Greven / Germany Structural engineer and Design of patterning: . . . . . . . . . . Teschner, Kosel / Germany Erection planning: . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Steel erection: . . . . . . . . . . . . . . . . . Evren, Istanbul / Turkey Wire ropes: . . . . . . . . . . . . . . . . . . . . Görlitzer Draht-und Hanfseilfabrik, Görlitz / Germany;
  93. PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . CENO TEC, Greven / Germany Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © CENO TEC, Greven / Germany
  94. | Roofi ng of stand, Estádio Intermunicipal, Faro-Loulé / Portugal Location: . . . . . . . . . . . . . . . . . . . . . . Faro / Portugal Completion: . . . . . . . . . . . . . . . . . . . 2003
  95. Roofed area: . . . . . . . . . . . . . . . . . . . 10,168 m2 Membrane material type: . . . . . . PES/PVC fabric (precontraint) Client: . . . . . . . . . . . . . . . . . . . . . . . . . Town council of Faro und Loulé / Portugal Architect: . . . . . . . . . . . . . . . . . . . . . . HOK Sport, London / England; AARQ Atelier de Arquitectura, Lissabon / Portugal;
  96. W.S. Atkins, London / England Structural engineer: . . . . . . . . . . . W.S. Atkins, London / England; Tensys, Bath / England General contractor for membrane roof: . . . . . . . . . . . . . . . Somague, Sintra / Portugal Design of patterning: . . . . . . . . . . IPL, Radolfzell / Germany Erection planning wire ropes: . . Schlaich Bergermann & Partner, Stuttgart / Germany Steel erection: . . . . . . . . . . . . . . . . . SIMI, Lisbon / Portugal Wire ropes: . . . . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Erection of cable structure: . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . CENO TEC, Greven / Germany Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © CENO TEC, Greven / Germany 24 | Stand roofi ng, Fenerbahce stadium / Turkey Location: . . . . . . . . . . . . . . . . . . . . . . Istanbul / Turkey Completion: . . . . . . . . . . . . . . . . . . . 2002
  97. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 20,400 m2 Membrane material type: . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Fenerbahce, Istanbul / Turkey Architect: . . . . . . . . . . . . . . . . . . . . . . Teschner, Kosel / Germany (Membran dach);
  98. A & Z Akzu, Istanbul / Turkey (Tribünen) General contractor for membrane roof: . . . . . . . . . . . . . . . CENO TEC, Greven / Germany Structural engineer und design of patterning: . . . . . . . . . . Teschner, Kosel / Germany Compensation tests: . . . . . . . . . . . Labor Blum, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Steel erection: . . . . . . . . . . . . . . . . . Temsan, Ankara / Turkey Membrane fabrication: . . . . . . . . CENO TEC, Greven / Germany Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © CENO TEC, Greven / Germany
  99. | Roofi ng of stands, Volkswagen Arena / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Allerpark, Wolfsburg / Germany Completion: . . . . . . . . . . . . . . . . . . . 2002
  100. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 15,000 m2 Membrane material type: . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Wolfsburg AG, Wolfsburg / Germany Architect: . . . . . . . . . . . . . . . . . . . . . . Büro Hpp, Düsseldorf / Germany General contractor for membrane roof: . . . . . . . . . . . . . . . CENO TEC, Greven / Germany Structural engineer: . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Design of patterning: . . . . . . . . . . Teschner, Kosel / Germany Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany; CENO TEC, Greven / Germany
  101. Steel erection: . . . . . . . . . . . . . . . . . dbn-Planungsgruppe Dröge-Baade- Nagaraj, Salzgitter / Germany Wire ropes: . . . . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . CENO TEC, Greven / Germany Membrane erection: . . . . . . . . . . . CENO TEC, Greven; Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © CENO TEC, Greven / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Nîmes / France Completion: . . . . . . . . . . . . . . . . . . . 1988
  102. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 4,000 m2 Membrane material type: . . . . . . rope-supported PES/PVC fabric pillow Client: . . . . . . . . . . . . . . . . . . . . . . . . . Ville de Nîmes / France Architect: . . . . . . . . . . . . . . . . . . . . . . Finn Geipel & Nicolas Michelin, Paris / France Structural engineer: . . . . . . . . . . . Schlaich Bergermann & Partner, Stutt- gart / Germany (Rudolf Bergermann, Werner Sobek, Jochen Bettermann)
  103. Design of patterning: . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany; IF-Group, Horst Dürr, Konstanz / Germany Steel erection: . . . . . . . . . . . . . . . . . Baudin Chateauneuf, Nîmes / France Membrane fabrication: . . . . . . . . Stromeyer, Konstanz / Germany Textile Acoustic module: . . . . . . . Koch Hightex, Rimsting / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © PFEIFER, Memmingen / Germany
  104. | Stand roofi ng Sheikh Khalifa Bin Zayed Stadium / United Arab Emirates Location: . . . . . . . . . . . . . . . . . . . . . . Al Ain / United Arab Emirates Completion: . . . . . . . . . . . . . . . . . . . 2004
  105. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 7,500 m2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Government of Abu Dhabi / United Arab Emirates Architect: . . . . . . . . . . . . . . . . . . . . . . Rice Perris Elli, Dubai / United Arab Emi- rates; Crang & Boake, Toronto / Canada General contractor for membrane roof: . . . . . . . . . . . . . . . Mero, Würzburg / Germany Structural engineer: . . . . . . . . . . . Mero, Würzburg / Germany Design of patterning: . . . . . . . . . . If-Group, Reichenau / Germany Erection planning: . . . . . . . . . . . . . CENO TEC, Greven / Germany; If-Group, Reichenau / Germany Steelwork: . . . . . . . . . . . . . . . . . . . . . Mero, Würzburg / Germany Secondary steel: . . . . . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Membrane fabrication: . . . . . . . . CENO TEC, Greven / Germany Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Erection of wire ropes: . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © MERO-TSK International, Würzburg / Germany
  106. | Roofi ng of Waldstadion, Frankfurt / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Frankfurt am Main / Germany Completion: . . . . . . . . . . . . . . . . . . . 2005
  107. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 27,000 m2 Adaptable part: . . . . . . . . . . . . . . . . approx. 8,000 m2 Membrane material type: . . . . . . Glass/PTFE fabric Adaptable part: . . . . . . . . . . . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Waldstadion Frankfurt am Main / Germany, Gesellschaft für Projekt- entwicklung mbH
  108. Architect: . . . . . . . . . . . . . . . . . . . . . . gmp -von Gerkan, Marg and Partners Structural engineer: . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Design of patterning: . . . . . . . . . . IF-Group, Reichenau / Germany Approval of individual cases: . . . Labor Blum, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Erection planning membrane: . IF-Group, Reichenau / Germany Steel erection: . . . . . . . . . . . . . . . . . Max Bögl, Neumarkt / Germany Wire ropes: . . . . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany; Augsburger Drahtseilfabrik, Friedberg / Derching / Germany Membrane fabrication: . . . . . . . . Skyspan Europe, Rimsting / Germany Erection of cable structure: . . . . Inauen-Schätti, Tschachen / Switzerland; VSL, Subingen / Switzerland Membrane erection: . . . . . . . . . . . Skyspan Europe, Rimsting / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Heiner Leiska, Kiel / Germany
  109. | Roofi ng of stands, Estadio Olimpico, Seville / Spain Location: . . . . . . . . . . . . . . . . . . . . . . Seville / Spain Completion: . . . . . . . . . . . . . . . . . . . 1999
  110. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 25,000 m2 Membrane material type: . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Sociedad Estadio Olimpico de Seville / Spain; Junta de Andaluciá Architect: . . . . . . . . . . . . . . . . . . . . . . Cruz `Y Ortiz, Seville / Spain General contractor for membrane roof: . . . . . . . . . . . . . . . ACS, Seville / Spain Structural engineer and Design of patterning: . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Steel erection: . . . . . . . . . . . . . . . . . ACS, Seville / Spain Supply and erection of cable structure: . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . CENO TEC, Greven / Germany Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © CENO TEC, Greven / Germany
  111. | Roofi ng of stands, Gottlieb Daimler Stadion / Germany Location: . . . . . . . . . . . . . . . . . . . . . . Stuttgart / Germany Completion: . . . . . . . . . . . . . . . . . . . 1992
  112. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 34,000 m2 Membrane material type: . . . . . . PES/PVC fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Sportamt/Hochbauamt Stuttgart / Germany
  113. Architect: . . . . . . . . . . . . . . . . . . . . . . Weidleplan Consulting, Stuttgart / Germany; Siegel & Partner, Stuttgart / Germany Design of patterning: . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Design of patterning: . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany
  114. Steel erection: . . . . . . . . . . . . . . . . . Haslinger, München / Germany Cable structure: . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . Koch Hightex, Rimsting / Germany Membrane erection: . . . . . . . . . . . Koch Hightex, Rimsting / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © PFEIFER, Memmingen / Germany 228 30 | Roofi ng of Bullfi ght Arena, Vista Alegre, Madrid / Spain Location: . . . . . . . . . . . . . . . . . . . . . . Calle de Nueva Contrucción, Madrid / Spain Completion: . . . . . . . . . . . . . . . . . . . 2000
  115. Roofed area: . . . . . . . . . . . . . . . . . . . approx. 1,960 m2 Material type, pillow: . . . . . . . . . . PES/fabric (outer), Rope-supported ETFE foil (inner)
  116. Client: . . . . . . . . . . . . . . . . . . . . . . . . . Arturo Beltrán, Palumi S.A., Madrid / Spain Concept and structural engineer: . . . . . . . . . . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Design of patterning: . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany
  117. Wire ropes: . . . . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . Skyspan, Rimsting / Germany Membrane erection: . . . . . . . . . . . Skyspan, Rimsting / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Roland Halbe Fotografi e, Stuttgart / Germany
  118. | Roofi ng of stands, Jaber Al-Ahmad Stadium/Kuwait Location: . . . . . . . . . . . . . . . . . . . . . . Kuwait City / Kuwait Completion: . . . . . . . . . . . . . . . . . . . 2007
  119. Roofed area: approx: . . . . . . . . . . . approx. 40,000 m2 Membrane material type: . . . . . Glass / PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Ministry of Public Works, Kuwait Structural engineer: . . . . . . . . . . . Weidleplan Consulting, Stuttgart / Germany Structural engineer: . . . . . . . . . . . Schlaich Bergermann & Partner, Stuttgart / Germany Consulting for ring beam, membrane, wire ropes: . . . . . . . . IF-Group, Reichenau / Germany (for Weidleplan)
  120. Design of patterning: . . . . . . . . . . Birdair, Amherst / USA Wire ropes: . . . . . . . . . . . . . . . . . . . . BRIDON/BTS Drahtseile, Doncaster and Gelsenkirchen / Germany Erection of wire ropes: . . . . . . . . . Montageservice SL, Hallbergmoos; PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . Birdair, Amherst / USA Membrane erection: . . . . . . . . . . . Birdair, Amherst / USA; Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Montageservice SL, Hallbergmoos / Germany
  121. | Roofi ng of Velodrome (redesign), Abuja / Nigeria Location: . . . . . . . . . . . . . . . . . . . . . . Abuja, Nigeria Completion: . . . . . . . . . . . . . . . . . . . 2006
  122. Roofed area: . . . . . . . . . . . . . . . . . . . 10,649 m2 Membrane material type: . . . . . . Glass/PTFE fabric Client: . . . . . . . . . . . . . . . . . . . . . . . . . Federal Government of the Federal Republic of Nigeria General contractor: . . . . . . . . . . . . Bilfi nger Berger AG, Wiesbaden / Germany, Julius Berger Nigeria Plc., Abuja / Nigeria Structural engineer: . . . . . . . . . . . form Tl, Radolfzell / Germany Design of patterning: . . . . . . . . . . form Tl, Radolfzell / Germany Materials testing: . . . . . . . . . . . . . . Labor Blum, Stuttgart / Germany Erection planning: . . . . . . . . . . . . . IF-Group, Reichenau / Germany Steel erection: . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Wire ropes: . . . . . . . . . . . . . . . . . . . . PFEIFER, Memmingen / Germany Erection of rope net: . . . . . . . . . . . PFEIFER, Memmingen / Germany Membrane fabrication: . . . . . . . . CANOBBIO, Castelnuovo Scrivia / Italy Membrane erection: . . . . . . . . . . . Montageservice SL, Hallbergmoos / Germany Photo: . . . . . . . . . . . . . . . . . . . . . . . . . © Bilfi nger Berger Nigeria GmbH, Wiesbaden / Germany